Three Phase Duplex Water Pump Motor Starter Controller

  • Y2-4000D

  • LXBKZ

Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

图片1

Y2 3-phase LCD display pump controller is of high technology for starting, stopping and protecting various pumps and motors. Very important accessories for starting pumps and motors.The control panels are used for both water supply and drainage, and feature a complete pump automation system.


Typical application scenarios:

-Agricultural irrigation/ pumping

-Pressure Booster Systems

-Waste water treatment

-Water Tanks/Wells

-Drainage System

-Cooling Towers

-Flood Control

-Fishing Boat

图片2

Specifications of water pump controller

Type Y2
Model Y2-4KW Y2-7.5KW Y2-11KW Y2-15KW
Rated Power 0.75-4KW 1.1-7.5KW 1.1-11KW 2.2-15KW
Rated Input Voltage 380+10%/50Hz or 60Hz
Qty.of Controlled Pumps Dual pumps
Display LCD display
Signal Transmission Mode Level float switch                                                                          Level probe                                                                          
Pressure switch                                                                   
Electric contact pressure gauge
Water Level Indication High/Middle/Low
Max.Control Distance ≤2000m without strong electric and electromagnetic fields
Over/under-voltage Range 304V-456V(adjustable)
Protections Pump stalled protection
Dry run protection
Over-load protection
Under-voltage protection
Over-voltage protection
Open phase protection
Short circuit protection
Main Functions Time setting
Fault detection
Anti-rust inspection
Dual pump rotation
Automatic restart after power recovery
Working temperature
Working humidity
Degree of protection
Install position
-25ºC-- +55ºC
20%--90%RH, no drips concreted
IP22
Wall mounting
Product Size 400x300x190mm
Package Box size:26.2*17.2*38cm
Carton size:54*39.5*55.5cm
PCS/CTN:6

11图片12

图片4

图片5图片6图片7图片89

1)Can you provide OEM or ODM  ?
Yes,we can make the orders according to your detailed request.

2)what is your delivery time?
It takes 3-5 days for sample orders,and 15-20 days for orders.


3)How does your factory do the quality control?
Our production process follow up the ISO standard and we control the product quality from the raw materials to the finished product,each of our control panel will be fully assembled and strictly tested before packing and shipping.


10


Previous: 
Next: 
Building F183, No.2, Lane 158, Gangye Road, Xiaokunshan Town, Songjiang District, Shanghai
Leave a Message
Send Us A Message

Quick Links

Copyright  ©  Shanghai Winning Electric Co., Ltd. Support By Leadong | Sitemap |  沪ICP备17056656号-2