Municipal Water &Wasterwater Pump Control Panel Box

Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

图片1


Winning designs and builds Control Panels for pump control and protection in irrigation systems, sewage, transfer pumping, wastewater lift stations, pump houses, pump chambers, septic tanks, sand filters, pond aerations and fountain control.Y series is the automatic LCD display pump controller with Y1 for single pump and Y2 for twin pumps.


Typical application scenarios:

-Agricultural irrigation/ pumping

-Pressure Booster Systems

-Waste water treatment

-Water Tanks/Wells

-Drainage System

-Cooling Towers

-Flood Control

-Fishing Boat

图片2

Specifications of water pump controller


Type Y2
Model Y2-4KW Y2-7.5KW Y2-11KW
Rated Power 0.75-4KW 1.1-7.5KW 1.1-11KW
Rated Input Voltage 380+10%/50Hz or 60Hz
Qty.of Controlled Pumps Dual pumps
Display LCD display
Signal Transmission Mode Level float switch                                                                            Level probe                                                                          
Pressure switch                                                                   
Electric contact pressure gauge
Water Level Indication High/Middle/Low
Max.Control Distance ≤2000m without strong electric and electromagnetic fields
Over/under-voltage Range 304-456VAC(adjustable)
Protections Pump stalled protection
Dry run protection
Over-load protection
Under-voltage protection
Over-voltage protection
Open phase protection
Short circuit protection
Main Functions Time setting
Fault detection
Anti-rust inspection
Dual pump rotation
Automatic restart after power recovery
Working temperature
Working humidity
Degree of protection
Install position
-25ºC-- +55ºC
20%--90%RH, no drips concreted
IP22
Wall mounting
Product Size 400x300x190mm
Package Box size:26.2*17.2*38cm
Carton size:54*39.5*55.5cm
PCS/CTN:6

12

图片5图片6

图片5图片6图片7图片89

FAQ

1)How does your factory do the quality control?
  Our production process follow up the ISO standard and we control the product quality from the raw materials to the finished product,each of our control panel will be fully assembled and strictly tested before packing and shipping.

2),What is the approximate life time for your control panel?
  The designed life time of control panel is 8 years.

3),What is your after sales service policy?
  According to the ordering quantity ,we will give some free spare parts or controller for maintenance or replacement and we will give technical training.takes 3-5 days for sample orders,and 15-20 days for orders.

4),How can I trust you ?
  We have being devoting the pump control panel manufacturing and selling since 2016,now our company has been audited and approved ISO9001 and CE certification.Many pump supplier are using our controller to control and protect their pumps and motors.We can show you our workshop and welcome your visit to our factory.

5),What's your main market?
  Asia/Europe/Middle East/North and south America/Africa etc.

6),How is the payment?
  T/T  L/C

微信图片_20220528132021


Previous: 
Next: 
Building F183, No.2, Lane 158, Gangye Road, Xiaokunshan Town, Songjiang District, Shanghai
Leave a Message
Send Us A Message

Quick Links

Copyright  ©  Shanghai Winning Electric Co., Ltd. Support By Leadong | Sitemap |  沪ICP备17056656号-2